How it's built

Flat pack in. Steel vault out.

This is the whole idea. Flat panels are assembled at the installation site. The crew, base, tools, and timing depend on the model and site. Here's exactly how your vault goes up.

My Yard Vault 4 Corners build step
Delivery day

Arrives flat

Your entire vault shows up as a flat, palletized stack of steel, floor, corrugated walls, roof, door, and every bolt. Light enough to haul on a utility trailer and narrow enough to carry through a 32-inch side gate. Confirm the delivery method, path dimensions, and any transport or site requirements.

Needs: a trailer or pickup, and a clear path to the spot.

All it takes
2 people Hand tools only About an hour No crane No concrete Check local permit requirements
My Yard Vault 4 Corners panels flat-packed and shrink-wrapped on a pallet
What shows up

The whole vault, on one pallet.

Every My Yard Vault 4 Corners ships as a single flat, shrink-wrapped stack, nothing loose, nothing missing. Unwrap it and everything you need is right there:

  • Galvanized steel floor pan
  • Corrugated 20-gauge wall panels
  • Roof panels & ridge cap
  • Lockable steel door(s)
  • Gas-strut & latch hardware
  • Every bolt, plus an assembly guide
The flat-pack advantage

Why it beats a container or a pre-built shed.

My Yard Vault 4 CornersShipping containerPre-built shed
Fits through a 32″ side gate✓✕✕
Foundation neededNone, sets on blocksLevel padLevel pad
On-site setup~1 hour, hand toolsCrane deliveryCrane / forklift drop
Relocate laterUnbolt & move itCrane requiredRarely possible
Material20-ga galvanized steelSteel (rust-prone)Wood / vinyl
Doors where you want✓ any sideFixed endsFixed

Smaller sizes go up in about 30 minutes. Larger vaults, roughly an hour.

Book an on-site build